Decision to make
Keep away from electrical hazards, wet finishes, and inaccessible cavities. Do not use open flame, a torch, improvised electrical heating, or a method that cannot be continuously controlled.
Record to build
Record which fixtures have no or reduced flow, hot or cold difference, room, exterior wall or unheated area, temperature timing, visible frost, and whether water is already leaking.
Question to compare
Ask the provider how the area will be isolated, accessed, thawed safely, inspected for splits, restored gradually, tested, insulated or rerouted if appropriate, and coordinated with finish work.
Useful closeout
Retain the verified freeze location, damaged segment, repair, test, affected insulation or finishes, prevention recommendation, permit when applicable, and any heating or building-envelope handoff.